The project required installing external power for the Garden Centres water feature display, installing 6 x IP65 sockets and power supply via NYY-J cabling.
Supply
We used our trusted wholesalers to supply us with the highest quality equipment whilst remaining within our clients budget.
Installation
Our team worked together to safely isolate any live cables, cordon off working areas and install our power supply at high level. Once the new supply was in place, we installed 6 x new external sockets before connected to the mains board.
Testing
Once installation was complete, we perform tests through each socket and the mains board to ensure the install is working properly and safely.