GSF Car Parts – Prenton

GSF Car Parts employs over 1,000 people covering all of the UK as well as Ireland. It operates over 60 stores and has a fleet of over 400 delivery vans.

GSF are currently running out an expansion program with Grattan Developments being the main contractor and Arrow Electrical were requested to provide the electrical design and installation.

Project Included

  • Site survey
  • Making safe of the existing installation
  • Set up temporary lighting and power for building works to commence

Electrical Design

  • Mains distribution
  • Containment
  • Cabling
  • General power
  • LED lighting, including emergency and external
  • Electrical heating
  • Electric vehicle charging point
  • CCTV & Security supplies
  • Data cabinet supplies

Fire Detection Design

  • Containment
  • Cabling
  • Installation of heat & smoke detection
  • Manual call points
  • Sounders & strobes
  • Control panel
  • Site plan
  • Fire-safe document box complete with log books

Testing and Commissioning

  • Commissioning paperwork
  • Certification
  • Full digital Operations Manual
  • Site handover & staff instruction and training

Completion of this project came within the dedicated timescale & budget.